SL.NO.
|
PROJECT DESCRIPTION
|
END USER DETAILS
|
WORK DESCRIPTION
|
ACTUAL STATUS
|
1 |
TABOUK PP STAGE VII CEMS PROJECT |
Owner: SAUDI ELECTIC CO. Main contractor: Al Toukhi Co |
Integration of Shelter, SHS Component and other Component.
FAT in our Works Installation of Dust Analyzer in the Stack Laying of Concrete Pad in the site Installation of Other Construction Activities Related this Project |
COMPLETED |
2 |
TOC ANALYZER'S IN OLF -II PLANT, TAG - 8851 & 1643 |
Petrokemya, Jubail |
Integration of SHS Component and other Component. FAT in our Works Laying of Concrete Pad in the site. Installation of Other Construction Activities Related this Project |
COMPLETED
|
3 |
DESIGN, SUPPLY AND INSTALLATION OF ELASTOMER LABORATORY | End User Detals: SABIC-HIEI Yanbu (Main contractor - Flour USA) |
Project description: Design, procurement, supply and installation of elastomer, Rubber and General Laboratory. Scope including Lab equipment. Lab furniture, Fume hood, Central Gas net work and other utilities. |
COMPLETED |
4 |
INSTALLATION OF H2S ANALYZER SYS. | SAUDI ARABIAN OIL COMPANY, Hawiya |
Installation of Analyzer SHS Component and other Component in the Site.
Connecting of Power & Signal Lines to the Analyzer Connecting of Sample Tube to the Sample Handling System |
COMPLETED |
5 |
INSTALLATION OF TOTAL SULPHUR ANALYZER SYS. | SABIC – SAFCO, Jubail |
Installation of Analyzer SHS Component and other Component in the Site. Connecting of Power & Signal Lines to the Analyzer. Connecting of Sample Tube to the Sample Handling System Arrangement for the DCS Configuration to the Analyzer |
COMPLETED |
6 |
INSTALLATION OF NOX,CO & O2 | SHARQ-SABIC, Jubail |
Integration of Shelter, SHS Component and other Component.
FAT in our Works Installation of Dust Analyzer in the Stack Laying of Concrete Pad in the site Installation of Other Construction Activities Related this Project |
COMPLETED |
7 |
MOISTURE ANALYZER INSTALLATION AT SAUDI BERRI GAS PLANT |
Aramco Berri Gas Plant - Jubail |
Installation of Analyzer SHS Component and other Component in the Site.
Connecting of Power & Signal Lines to the Analyzer
Connecting of Sample Tube to the Sample Handling System
|
COMPLETED |
8 |
UPGRADING OF COMBUSTIBLE GAS ANALYZER |
Petrokemya, Jubail |
Installation of Analyzer SHS Component and other Component in a Free Standing Rack to the Site.
Connecting of Power & Signal Lines to the Analyzer Connecting of Sample Tube to the Sample Handling System |
COMPLETED |
9 |
CEMS ANALYZER INSTALLATION | Saudi Kayan, Jubail |
Site Engg. Laying of Concrete Pad Installation of Analyzer Shelter, SHS Component and other Component in the Concrete Pad. Installation of Opacity Analyzer in the Stack During Shut Down Connecting of Power & Signal Lines to the Analyzer Connecting of Sample Tube to the Sample Handling System |
COMPLETED |
10 |
CONSTRUCTION OF NEW LABORATORY CHEMICAL STORAGE WITH EXPLOSION PROOF AND EXHAUST FACILITY | IBN ZAHR, Jubail |
Project Engg.
Laying of Concrete Pad Installation of Chemical Store in the Concrete Pad. Connecting of Power & Fire Alarm Signal Lines to the Field Panel Connecting of the Cooling Water Line to the Store |
COMPLETED |
11 |
UPGRADATION OF PH & CONDUCTIVITY ANALYZER |
Petrokemya, Jubail |
Installation of Analyzer SHS Component and other Component in a Free Standing Rack to the Site.
Connecting of Power & Signal Lines to the Analyzer Connecting of Sample Tube to the Sample Handling System |
COMPLETED |
12 |
SHELTER INTEGRATION | Client: Seimens End User: SEC (Jeddah and Yanbu) |
-Manufacturing of Shelter and Integration of the Analyzer and the SHS Components to the Shelter
|
COMPLETED |
13 |
REPLACEMENT OF PRIMARY AND SECONDARY SAMPLE HANDLING SYSTEM AT HIGH TEMPERATURE GAS LINE | End User: Hadeed, Jubail |
Project Engg
Installation of 24 No’s Sample Probes (M&C) to the Modules. Integration and Installation of 24 No’s Primary SHS Components. Installation of Pump (M&C) with Free Standing Rack Installation of Sample Cooler with Free Standing Rack Integration and Installation of 24 No’s Secondary SHS Components. |
COMPLETED |